

- 19 feb. 2017
Winter preparations underway
Wonderful Sunday with temperatures over 5 deg C and sun from a clear sky. Four guys from the crew preparing for the coming season. Here is a status report about things going on in the project. Installation of the load cell for the forestay Just picked up the delivery of the custom made load cell pin from Diverse Yachts which will be responsible for measuring the load on the forestay in different situations. The pin is connected to the control box which sits on the NMEA2000 b
61