top of page

ORCi Measurement and hull wash


The rig is lifted off and measured in both weight and balance. 167 kilos including halyards pretty OK for a 19 meter long mast.

Jim Altonen manövers the crane and Kim, Tomas and Anders assists on the ground.

The whole boat was lifted and washed under the waterline removing the dirt. Wetjob have no antifouling so we need to keep it clean on a regular basis.

Here some of the guys are working hard on the brushes, unfortunately we had no pressure in the water taps which resulted in that our high pressure cleaners could not be used.

Unfortunately it was to windy for stability measurements so the final ORCi papers could not be finalized. We need to find a time for that after Easter.

bottom of page