Intense preparations underway


The weekend was filled of intense work on Wetjob. There are so many things that need to be in place before we can be starting up the season.

All electronics are now more or less in place with a few exceptions. The project expanded into ripping out all of the power cables and exchanging breakers into visible breaker boxes with LED's. Here Danne is making his magic on the power switches.

Anders and I made a initial dock tune on the rig finding the optimal 12 knot start configuration. After a few hours of twisting turnbuckles , pumping the hydraulics, putting in shims and measuring pressure we finally arrived in a hopefully good starting tune. Now we need to get out on the water.