top of page

Tuesday training session


Another Tuesday evening with mostly dockside preparations with various results. Although we are half way into May, still temperature is unusually cold dipping under zero degrees and with some snow fronts passing by.

Tried to get the new furling sails in place and the Karver lock mounted in the rig.

Trying to get the sprit mount in the right position was not easy.

The new Sheetbags and Winch Covers from Blue Performance matches the boat perfectly.

Mats all the way up the rig measuring out the loop on the lock to the right length.

bottom of page